Skip to Main Content (Press Enter)

Logo UNIRC
  • ×
  • Home
  • Corsi
  • Insegnamenti
  • Professioni
  • Persone
  • Pubblicazioni
  • Strutture
  • Attività
  • Competenze

UNI-FIND
Logo UNIRC

|

UNI-FIND

unirc.it
  • ×
  • Home
  • Corsi
  • Insegnamenti
  • Professioni
  • Persone
  • Pubblicazioni
  • Strutture
  • Attività
  • Competenze
  1. Pubblicazioni

TENSILE FORCE MONITORING ON LARGE WINCH-ASSIST FORWARDERS OPERATING IN BRITISH COLUMBIA

Articolo
Data di Pubblicazione:
2018
Citazione:
TENSILE FORCE MONITORING ON LARGE WINCH-ASSIST FORWARDERS OPERATING IN BRITISH COLUMBIA / Mologni, O., Dyson, P., Amishev, D., Proto, A., Zimbalatti, G., Cavalli, R., Grigolato, S.. - In: CROATIAN JOURNAL OF FOREST ENGINEERING. - ISSN 1845-5719. - 39:2(2018), pp. 193-204.
Abstract:
The forest industry around the world is facing common challenges in accessing wood fiber on steep terrain. Fully mechanized harvesting systems based on specialized machines, such as winch-assist forwarders, have been specifically developed for improving the harvesting performances in steep grounds. While the mechanization process is recognized as a safety benefit, the use of cables for supporting the machine traction needs a proper investigation. Only a few studies have analyzed the cable tensile forces of winch-assist forwarders during real operations, and none of them focused on large machines normally used in North America. Consequently, a preliminary study focused on tensile force analysis of large winch-assist forwarders was conducted in three sites in the interior of British Columbia during the fall of 2017. The results report that in 86% of the cycles, the maximum working load of the cable was less than one-third of the minimum breaking load. The tensile force analysis showed an expected pattern of minimum tensile forces while the forwarders were traveling or unloading on the road site and high tensile forces when operating on steep trails, loading or traveling. Further analysis found that the maximum cycle tensile forces occurred most frequently when the machines were moving uphill, independently of whether they were empty or loaded. While the forwarders were operating on the trails, slope, travel direction, and distance of the machines from the anchor resulted statistically significant and able to account for 49% of tensile force variability. However, in the same conditions, the operator settings accounted for 77% of the tensile force variability, suggesting the human factor as the main variable in cable tensile force behavior during winch-assist operations.
Tipologia CRIS:
1.1 Articolo in rivista
Elenco autori:
Mologni, O.; Dyson, P.; Amishev, D.; Proto, A; Zimbalatti, G; Cavalli, R.; Grigolato, S.
Autori di Ateneo:
PROTO Andrea Rosario
ZIMBALATTI Giuseppe
Link alla scheda completa:
https://iris.unirc.it/handle/20.500.12318/714
Link al Full Text:
https://iris.unirc.it//retrieve/handle/20.500.12318/714/87344/Mologni_2018_CROJFE_Tensile_editor.pdf
Pubblicato in:
CROATIAN JOURNAL OF FOREST ENGINEERING
Journal
  • Dati Generali

Dati Generali

URL

http://www.crojfe.com/archive/volume-39-no-2/tensile-force-monitoring-on-large-winch-assist-forwarders-operating-in-british-columbia/
  • Utilizzo dei cookie

Realizzato con VIVO | Designed by Cineca | 26.6.0.0